top of page
Construction Site
< Back

Earthwork Construction Inspection Level 1 Class

Qualification Details

Written Exam Required.

Full Class Price:

Proficiency Exam Required.

Allowed up to 2 hours to complete the written exam.

$475

The Trainee must demonstrate proficiency in Florida Methods (FM), specifically in the Density of Soils and Bituminous Concrete Mixtures in Place by Nuclear Method (FM 1-T 238), the Determination of Moisture Content by Means of a Calcium Carbide Gas Pressure Moisture Tester (FM 5-507) (also known as the "Speedy Moisture Test"), and reporting the test results in to the ERS.

Closed Book Written Exam.

Class Duration:

Two Days

Class Objective:

To safely and effectively sample soil materials from the roadway, take earthwork density readings and record those findings in an FDOT Density Log Book.

Subject Matter:

-Moisture Density Relationship (FM 5-521 and 5-525)
-Density of Solid and Bituminous Concrete Mixtures in Place by the Nuclear Method (FM 1-T 238)

-Determination of Moisture Content by Means of a Calcium Carbide Gas Pressure Moisture Tester (FM 5-507)

-Reporting Test Results in the FDOT Density Log Book, Sampling Soils, Limerock, Cemented Coquina, Bank Run Shell, and Stabilizing Materials from the Roadway (FM 5-504)

-Nuclear Gauge Maintenance
-Sampling Soils and Limerock.

Initial Qualification Requirements:

-Pass Earthwork Level 1 Written exam
-Pass Earthwork Level 1 Proficiency exam
-Valid Nuclear Radiation Safety Certificate

Recommended Training Course, APNGA (American Portable Nuclear Gauge Association), https://www.apnga.com

 

Re-Qualification Requirements:

-Pass Earthwork Level 1 Written exam
-Valid Nuclear Radiation Safety Certificate.

Allowing your Earthwork Construction Inspection Level 1 Qualification to expire, will require students to pass Earthwork Construction Inspection Level 1 Written & Proficiency Exams.

bottom of page